Client Site Manager with international expertise providing quality leadership and construction work on gas turbine, internal combustion and steam turbine power projects. Skilled at conflict resolution and stress management; with demonstrated qualifications in promoting company standards by ensuring accuracy of systems results. Additional skills include:
• Site management of projects from $18M-$400M
• Project engineering
• Commissioning supervision
• Technical Field Assistance
• Direct labor supervision
• Direction and control of contractors of all disciplines,
• Ability to work with various types of PLC’s
• OSHA compliance
• Quality assurance
• Power Generation (CT, BOP, HRSG and ST)
Education
Experience
Siemens Power and Gas
Site Commissioning Manager June 2015 – September 2020
Various sites working with the SGT6-5000F,8000H, 2000E and SST6 frame gas turbines and steam turbines. Currently working in Canada on a SGT6- 5000F 6.2 in a 1 X 1 configuration.
Siemens Power Generation
Site Commissioning Manager, Cane Run 7, KY September 2014 – June 2015
Oversaw and led the overall commissioning of the 2 SGT6-5000F (5ee) natural gas turbines and SST6-5000/K-N steam turbine. Supported the customer commissioning team with the hot and cold commissioning activities.
Site Commissioning Manager, Kemper County, MS July 2013 – March 2014
Supervised overall commissioning of the 2 SGT6-5000F duel fuel syngas and natural gas turbines. Supported the customer commissioning team with the hot and cold commissioning activities.
Site Commissioning Manager, Cape Canaveral, FL June 2012 – July 2013
Responsible for the overall commissioning of the 3 SGT6-8000H duel fuel gas turbines. Supporting the customer commissioning team with the hot and cold commissioning activities.
Site Commissioning Manager, Berlin, Germany July 2011 – June 2012
Directed the commissioning of first 60Hz SGT6-8000H duel fuel gas turbine, at Siemens test facility in Berlin, Germany.
Site Commissioning Manager, Lubbock, TX April 2011 – June 2011
Constructed the overall commissioning of the 1 W501FD4 gas turbines. Supporting the customer commissioning team with the hot and cold commissioning activities. Scheduled vendor and additional Siemens support, including an engineering project on the study of the single piece exhaust system.
Site Commissioning Manager, Richmond, NC October 2010 – April 2011
Led and monitored commissioning of the 2 W501FD4 gas turbines. Supporting the customer commissioning team with the hot and cold commissioning activities.
Site Manager / Commissioning Manager, Durango, Mexico July 2008 – September 2010
Spearheaded the overall construction and commissioning TFA personnel on site as well as the local entity personnel for a 450 MW combined cycle power plant utilizing 2 W501FD3 Gas turbines and a Siemens KN steam turbine in Durango, Mexico. Attended local meetings and negotiations with the customer and their contractor for items pertaining to the technical assistance provided by Siemens. Monitored site budget and procurements.
Commissioning / Site Lead, Turbigo, Italy May 2007 – June 2008
Guided commissioning activities for this 850 MW power plant. Addition of two HSRG and Steam Turbine modifications with a consortium partner. The power plant, consisting of two combined cycle V94.3 gas turbines, air-cooled generators, and all auxiliary equipment including balance of plant equipment.
Lead Commissioning, Point Lisas, Trinidad February 2007 – May 2007
Led all commissioning activities on night shift for this 300 MW turnkey power plant, consisting of two simple cycle 501D gas turbines, air- cooled generators, and all auxiliary equipment including 3 gas compressors.
Lead I & C., Chilca, Peru September 2006 – December 2006
Completed all I & C commissioning activities for this 150 MW turnkey power plant, consisting of one simple cycle V84.2 gas turbine, air-cooled generators, and all auxiliary equipment.
Lead BOP Controls Engineer, Ventanilla, Peru April 2006 – September 2006
Provided project management all I & C commissioning activities for this 450 MW addition of two HSRG and Stem Turbine power plant, consisting of two combined cycle V84.2 gas turbines, air-cooled generators, and all auxiliary equipment including balance of plant equipment, and Heat Recovery Steam Generators.
Commissioning Manager, Gomez Palacio, Mexico April 2005 – April 2006
Managed all commissioning activities for this 225 MW upgrade for a power plant, consisting of two combined cycle 501B gas turbines, hydrogen- cooled generators, and balance of plant equipment, including Heat Recovery Steam Generators.
Lead I & C, San Lorenzo, Mexico September 2003 – April 2005
Contributed towards all I & C commissioning activities for this 300 MW turnkey power plant, consisting of two simple cycle 501F gas turbines, air-cooled generators, and all auxiliary equipment including 2 Sundyne compressors and 2 Atlas Copco compressors. Direct activities of technical field advisors (TFAs).
ADDITIONAL RELEVANT EXPERIENCE
Siemens Westinghouse Power Corporation, I & C Lead / CT Engineer, Rolling Hills, USA
Westinghouse Electric Corporation, TXP Engineer, Blythe
TXP Engineer / Administrator, El Encino, Mexico
TXP Administrator, Arcadia
TXP Engineer / Administrator, Payne Creek
TXP Engineer, St. Francis
WDPF Engineer, North Duri, Indonesia
TXP Engineer, Manchief
Jenbacher Energie Systeme, Commissioning Engineer
Mustang Power Systems, Power Systems Engineer
Statordyne, LLC., Field Service Engineer
Wise Electronic Services, Company Owner
MILITARY EXPERIENCE
US Navy EN2